Overview
Induscoat carries out coating inspection and quality control before, during and after the work: substrate condition, ambient conditions, surface profile, soluble salts, film thickness, holiday and adhesion testing. Every reading goes into a file handed to the client, for industrial sites across Quebec and Ontario, working from LaSalle, Montreal.
Induscoat inspects coatings on steel structures, tanks, piping, equipment and concrete for industrial sites in Quebec and Ontario, working from LaSalle, Montreal. Before the work, existing coatings are rated to ISO 4628 and ASTM D610, adhesion is checked and old paint is sampled for lead. During the work, ambient conditions and dew point, cleanliness, surface profile (ISO 8503, ASTM D4417), soluble salts (ISO 8502-6 and ISO 8502-9), wet film thickness (ASTM D4414) and dry film thickness (SSPC-PA 2, ISO 19840) are measured. After application, holiday testing (NACE SP0188, ASTM D4787), adhesion testing (ASTM D4541, D3359, D7234) and cure checks confirm the coating before return to service. We carry out the inspections the specification calls for and record the readings; where the specification requires a third-party certified inspector, we coordinate with the inspector appointed by the client.
What we inspect and which type of inspection to choose
We inspect coatings on steel structures, tanks, piping, equipment and concrete, whether new, being applied or in service. Inspection is part of our industrial and protective coatings, our core business.
We carry out the inspections the specification calls for and record the readings. Where the specification requires a third-party certified inspector, we coordinate with the inspector appointed by the client: access, hold points and exchange of records. The type of assignment depends on the situation:
- Inspection built into our own work: every Induscoat painting or coating job includes its records. This is the most common case.
- Condition survey of an existing coating: to decide between spot repair, overcoat and full removal before repainting.
- Monitoring of another applicator's work, at the client's request: checking each step and its records against the specification.
- Coating failure analysis: when a coating blisters, peels or rusts early, to find the cause before the work is redone (coating failure modes and diagnosis).
The service is for industrial sites only. Readings are taken by our crews and qualified subcontractors.
Before the work: the starting condition
Pre-work inspection establishes the condition of the substrate and the existing coating, and it is what sets the preparation grade and the system. It is done at the survey, before quoting or at the start of the job.
- Degradation rating to ISO 4628 (blistering, rusting, cracking, flaking) and rust rating to ASTM D610, zone by zone, with photos.
- Adhesion of the existing coating, by pull-off or knife test, to find out whether it can be overcoated.
- Thickness and number of existing coats, which tell the history and how much load an overcoat will add.
- Lead in old paint, through laboratory analysis of collected samples. A positive result changes the method, the containment and the price (lead paint removal).
- Substrate condition: pitting, metal loss, welds, oil or salt contamination.
On concrete, moisture, laitance and surface soundness are also checked before the system is chosen.
During the work: conditions, preparation, thickness
During the work, conditions are checked before every coat, then thickness during and after application. A defect fixed at this stage costs far less than a repair after cure.
- Ambient conditions: air and substrate temperature, relative humidity and dew point, read at the start of the shift and for every coat (ISO 8502-4). Application only starts when the gap between substrate temperature and dew point meets the specification and the data sheet.
- Cleanliness and preparation grade: comparison with ISO 8501-1 or the SSPC visual guides, dust to ISO 8502-3.
- Surface profile: comparator to ISO 8503, or ASTM D4417 (comparator, depth micrometer or replica tape) (surface profile).
- Soluble salts: extraction to ISO 8502-6 and conductivity measurement to ISO 8502-9, against the limit set by the specification.
- Wet film thickness: comb gauge to ASTM D4414, during application, so it can be corrected on the spot.
- DFT measurement: to SSPC-PA 2 or ISO 19840, with the sampling plan the standard sets (dry film thickness). Areas out of tolerance are recoated.
Every reading carries the date, time, area and instrument used, with its calibration check.
After application: holidays, adhesion, cure
After application, we confirm that the film is continuous, bonded and cured before return to service. These tests are set by the specification; some are destructive and are done on selected areas or on test panels.
- Holiday testing (discontinuity detection): low-voltage wet sponge or high-voltage, depending on film thickness and coating type, to NACE SP0188 on steel and ASTM D4787 on concrete. It is the standard test for immersion linings (holiday test).
- Adhesion testing by pull-off: ASTM D4541 on metal, ASTM D7234 on concrete. The X-cut or cross-cut tape test (ASTM D3359) gives a quick indication, mainly on thin films.
- Cure: hardness, solvent rub or cure time, using the method on the data sheet, before filling or return to service.
- Final visual examination: runs, misses, inclusions and thin coverage on edges and welds.
Defects found are marked, repaired to the manufacturer's procedure, then tested again.
Hold points and the file you receive
Hold points are the steps where work stops until the readings are accepted. They are set with the client before the job, in an inspection and test plan, then followed in this order:
- Inspection plan: planned checks, standards, acceptance criteria, frequency and who is responsible for each check.
- Hold point after preparation: cleanliness, profile and salts accepted before the primer.
- Hold point between coats: thickness and recoat window checked before the next coat.
- Final hold point: holiday test, adhesion and visual examination accepted before return to service.
- File handed over: inspection plan, condition and thickness readings, test results, data sheets, batch numbers, non-conformances and their corrections, photos.
When an inspector appointed by the client attends the hold points, we pass on the readings as we go and wait for release before continuing.
Site conditions and safety
Inspection follows the same safety rules as the work, plus a few measures of its own. They are settled in the quote and with the site's health and safety department.
- Confined spaces: inspecting tanks, cells and ducts follows the site's entry procedure (permit, atmosphere monitoring, attendant outside, ventilation).
- High-voltage holiday testing: barricaded area, personnel informed, never with solvent vapour or a flammable atmosphere present.
- Work at height: scaffolding, lifts or rope access, often the same as for the work itself.
- Lockout of equipment before any internal inspection.
- Winter: readings are taken inside the heated enclosure, where the coating is applied and cures.
Pricing: by quote
Coating inspection is priced by quote, because the cost depends on the number of checks and how much time on site is required. Five factors drive it:
- The type of assignment: inspection built into our work, condition survey, monitoring of another applicator or failure analysis.
- The area and the number of zones, which set the number of readings under the sampling plan.
- The tests required, laboratory analyses in particular.
- Access and safety requirements: confined space, height, remote site.
- The number of hold points and the time spent on site.
Send the specification, photos and the location with your quote request: we reply within 24 business hours.
Where we work
Induscoat provides coating inspection in Montreal, across Quebec and in Ontario, working from LaSalle. Each regional page sets out the sectors and exposure conditions specific to that territory:
- Montreal and Montérégie
- Quebec, for the province as a whole
- Abitibi-Témiscamingue
- Côte-Nord
- Saguenay–Lac-Saint-Jean
- Mauricie–Centre-du-Québec
- Ontario
When an inspection is not enough
An inspection is not enough when the problem is known and keeps coming back: it records the condition, it does not always explain why the coating failed. If the same system blisters or peels from one shutdown to the next, a root cause analysis is needed (specification, preparation, application conditions, compatibility, service conditions), which falls under our strategic advisory service.
If the inspection reveals metal loss, cracks or deteriorated concrete, the substrate is repaired before any new coating, through our maintenance and rehabilitation service. And if the coating has to be redone, industrial painting or tank lining takes over, with the same inspections.
Typical Applications
- Inspection and quality control built into our painting and coating work
- Condition survey of existing coatings before repainting
- Holiday and adhesion testing of tank and immersion linings before return to service
- Coating failure analysis: blistering, peeling, early rusting
Typical Problems We Solve
- Coatings that blister or peel early with no readings to show what went wrong
- Film thickness too low or too high, found only after cure
- Holidays in immersion linings that become corrosion points in service
- Uncertainty whether an existing coating can be overcoated or must be removed
What You Receive
- Inspection and test plan with hold points, standards and acceptance criteria
- Ambient condition, profile, soluble salt and film thickness readings, dated and located
- Holiday, adhesion and cure test results, with defects marked and retested
- Close-out file with data sheets, batch numbers, non-conformances, corrections and photos
Timeline
Set in the quote according to the type of assignment, the area, the tests required and the number of hold points. Quote sent within 24 business hours of receiving the specification and photos.
Standards & Certifications
- ISO 8501-1 and ISO 8502-3, -4, -6, -9: cleanliness, dust, dew point and soluble salts
- ISO 8503 and ASTM D4417: surface profile measurement
- SSPC-PA 2, ISO 19840 and ASTM D4414: dry and wet film thickness
- NACE SP0188, ASTM D4787, ASTM D4541, D3359 and D7234: holiday and adhesion testing
Industries We Serve
- Energy and hydroelectric: penstocks, tanks, structures, piping
- Mining and metallurgy: tanks, thickeners, flotation cells, structures
- Water and wastewater: basins, tanks, concrete structures
- Chemical and petrochemical: storage tanks, containment areas, pipe racks
Service FAQ
Who inspects when the specification requires an independent inspector?
We carry out the inspections the specification calls for and record the readings. Where the specification requires a third-party certified inspector, we coordinate with the inspector appointed by the client: access to the work, notice before each hold point, and our readings passed on as we go. Our records and theirs then form one file.
Which tests does a tank lining need?
At minimum: ambient conditions and dew point before each coat, preparation grade and surface profile, soluble salts on the blasted steel, dry film thickness to SSPC-PA 2, then a holiday test to NACE SP0188 over the whole lining before filling. Adhesion tests and cure checks are added when the specification or the data sheet calls for them.
What is a hold point?
A step where work stops until the readings are accepted: typically after surface preparation, between coats and before return to service. Hold points are set in the inspection and test plan before the job starts. They prevent a coat from going on over a surface that does not meet the specification.
Can you inspect a coating applied by another contractor?
Yes, at the client's request. We can follow the work against the specification or survey a coating already in service, with readings recorded the same way as on our own jobs. For a coating that has failed, the survey is the starting point of a failure analysis.
How much does a coating inspection cost?
Pricing is by quote. It depends on the type of assignment, the area and number of zones, the tests required (laboratory analyses in particular), access and safety requirements, and the number of hold points. Send the specification, photos and the location: we send a quote within 24 business hours.
Technical guides
Related applications
Concrete industrial use cases where this service is applied.
Other Services
Areas we serve
- Industrial coatings and maintenance in Quebec
- Industrial coatings and maintenance in Montreal
- Industrial coatings and maintenance in Ontario
- Industrial coatings and maintenance in Abitibi-Témiscamingue
- Industrial coatings and maintenance on the Côte-Nord
- Industrial coatings and maintenance in Saguenay–Lac-Saint-Jean
- Industrial coatings and maintenance in Mauricie and Centre-du-Québec
- Industrial coatings and maintenance in Montérégie
Go deeper
Our technical notes on the subject — applicable standards, selection criteria and implementation traps.
Wet and dry film thickness: calculation, measurement and tolerances
Dry film thickness decides how well a coating protects, but it is controlled during application through the wet film. This guide explains the relationship between wet film, dry film and volume solids, the gauges used, measurement per SSPC-PA 2 and the consequences of a film that is too thick or too thin.
7 minOsmotic blistering in immersion coatings: causes, diagnosis and repair
Liquid-filled blisters on the internal lining of a tank or vessel most often point to osmotic blistering. This guide explains the mechanism, the role of soluble salts and temperature differences, rating per ASTM D714, and the repair and prevention options.
7 minCoating inspection and maintenance program: condition survey, mapping and repainting criteria
A coating inspection and maintenance program rests on a standardized condition survey, zone mapping, clear criteria for spot repair, partial or full repainting, an inspection frequency set by the owner and a multi-year budget. This guide explains how to build one.
7 minCoating inspection: thickness, adhesion and holiday testing
A coating is judged on measurements, not on how it looks. This guide covers the tests that matter on an industrial job: dry film thickness to SSPC-PA 2, adhesion to ASTM D4541 and D3359, low and high voltage holiday detection to NACE SP0188, ambient conditions, records and hold points.
7 minASTM D610 and SSPC-VIS 2: assessing the degree of rusting on painted steel
ASTM D610, published jointly with SSPC-VIS 2, rates the degree of rusting on painted steel with a grade and a distribution type. This guide explains the grade scale, the difference between spot, general and pinpoint rusting, how to run a reliable survey and how to use the result to choose between spot repair, overcoating and full repainting.
7 min