Overview
Induscoat paints and repaints steel structures at plants, mines and energy sites in Quebec and Ontario, working from LaSalle, Montreal: building frames, walkways, conveyors, overhead cranes and runways, pipe supports and stacks. Surfaces are prepared to the specified grade, the system is selected to ISO 12944, and film thickness is measured and recorded.
Induscoat paints and repaints steel structures on industrial sites in Quebec and Ontario, working from LaSalle, Montreal: building frames, walkways, conveyors, overhead cranes and runways, pipe supports, stacks and towers. Rust is rated to ISO 4628-3 or ASTM D610 to decide between spot repair, overcoat and full removal, often zone by zone. Surfaces are prepared to SSPC-SP 2, SP 3, SP 11, SP 6 or SP 10, the system follows the ISO 12944 corrosivity category, and dry film thickness is measured to SSPC-PA 2. Access is by lifts, scaffolding or rope, with protection over running equipment and work grouped into shutdowns where needed. Older frames are tested for lead before quoting.
The structures we paint
We paint load-bearing metal structures and steelwork on industrial sites, in place, often while operations continue. The goal is to protect the steel against corrosion; appearance and colour coding follow.
- Industrial building frames: columns, beams, roof trusses, bracing and process buildings.
- Walkways, stairs, platforms and handrails.
- Conveyors, conveyor galleries and transfer towers.
- Overhead cranes and crane runways: girders, rails, brackets and trolleys.
- Pipe supports and pipe racks (corrosion protection).
- Stacks, ducts, towers and pylons.
The service is for industrial sites only. Work is carried out by our crews and qualified subcontractors, under one quote and one inspection file.
Spot repair, overcoat or full removal
The choice between spot repair, overcoat and full removal is based on the condition of the existing paint, measured rather than judged by eye. Rust extent is rated to ISO 4628-3 or ASTM D610, then adhesion and existing film thickness are checked.
- Spot repair: rust limited to isolated points, sound paint elsewhere. The rusted areas are prepared, primed and topcoated, and nothing else.
- Overcoat (spot repair plus full coat): more widespread rust but paint still well bonded. After spot repairs, a compatible full coat evens out the protection. The old film must be able to carry the weight and stress of one more coat.
- Full removal: general rusting, flaking paint or poor adhesion. Everything comes off and a new system goes on.
Zone-by-zone repainting is often the best option: full removal where condition requires it, overcoat elsewhere. Our article on maintenance painting of steel structures sets out the method.
Surface preparation and paint system
Preparation and system are chosen together: a zinc-rich primer needs blast-cleaned steel, while a surface-tolerant primer can go on power-tool-cleaned steel.
- SSPC-SP 2 (hand tool cleaning): scrapers and wire brushes, for minor touch-ups where nothing else is possible.
- SSPC-SP 3 (power tool cleaning): powered brushes and discs, for spot repairs and areas near sensitive equipment.
- SSPC-SP 11 (power tool cleaning to bare metal): removes everything and leaves a profile, where blasting is not allowed but a good primer is required (power tool cleaning).
- SSPC-SP 6 (commercial blast cleaning): common for epoxy systems in moderate exposure.
- SSPC-SP 10 (near-white blast cleaning): for zinc primers and severe environments (abrasive blasting).
The system follows the site's ISO 12944 corrosivity category. Outdoors, the common build remains a zinc primer, an epoxy intermediate and a polyurethane topcoat; in a dry interior, a simpler system is enough. The thickness of each coat comes from the manufacturer's data sheet. For other system options, see our reference page on protective coatings.
Steel structure painting procedure
Painting a steel structure follows six steps, planned with operations.
- Survey: condition rated by zone, access, equipment below, possible shutdown windows.
- Quote and plan: method by zone, system coat by coat, access, containment, schedule coordinated with your shutdowns.
- Set-up: access, protection of equipment and product, containment of abrasive and overspray.
- Preparation: degreasing, preparation to the specified grade, dust removal.
- Application: stripe coat on edges, welds and bolting, then full coats, with dew point and steel temperature monitored.
- Inspection and records: thickness readings, condition logs, photos, data sheets and batch numbers.
Inspections and standards
Each coat is checked before the next, and the results go into the close-out file.
- SSPC-PA 2: dry film thickness measurement, with the number of readings and the tolerance the standard sets per area (dry film thickness).
- ISO 12944: corrosivity category and system selection (ISO 12944 explained).
- SSPC-SP 2, SP 3, SP 11, SP 6 and SP 10: preparation grade checked before each primer.
- ISO 4628-3 or ASTM D610: rust rating at the initial survey, used as the baseline for future inspections.
Ambient conditions (air and steel temperature, relative humidity, dew point) are logged every shift.
Access, safety and site conditions
On a steel structure, access and safety often weigh more than the paint itself. They are settled at the survey.
- Access: lifts, scaffolding or rope access, depending on height, ground conditions and congestion.
- Work above running equipment: nets, tarps and protective decking to catch debris, abrasive and drips; coordination with production shifts.
- Overhead cranes: lockout of the crane and its power supply, stops on the runway, coordination with operators.
- Containment: temporary enclosures for abrasive and overspray, heated in winter when the product requires it.
- Old lead-based paint: common on older frames. It calls for testing before the quote and specific measures, handled by our lead paint removal service.
- Shutdown planning: what cannot be done in operation (hot areas, above sensitive lines, moving parts) is grouped into the shutdown, with our project management service when needed.
Pricing: by quote
Steel structure painting is priced by quote. The factors that drive it:
- The area and the shape of the members: a lattice takes longer than a solid beam.
- The condition of the existing paint and the share of full removal.
- Access: height, lifts, scaffolding, rope access, work above equipment.
- The system and the preparation grade.
- The work window: in operation, during a shutdown, at night, in winter.
Send photos, approximate dimensions and the location with your quote request: we reply within 24 business hours.
Where we work
Induscoat provides steel structure painting in Montreal, across Quebec and in Ontario, working from LaSalle:
- Montreal and Montérégie
- Quebec, for the province as a whole
- Abitibi-Témiscamingue
- Côte-Nord
- Saguenay–Lac-Saint-Jean
- Mauricie–Centre-du-Québec
- Ontario
When this service is not the right answer
Painting is not the right answer once the steel has lost section: deep pitting, thinned members, or attacked connections and welds. Paint protects what is left, it does not restore lost strength. We stop, show you the condition, and the repair goes through our maintenance and rehabilitation service before repainting.
For equipment, tanks and machinery rather than structures, our industrial painting service is the better fit.
Typical Applications
- Structural steel painting of industrial building frames and process buildings
- Painting of walkways, platforms, stairs, pipe supports and pipe racks
- Overhead crane and crane runway painting
- Zone-by-zone maintenance repainting of conveyors, stacks and towers
Typical Problems We Solve
- Rust spreading at connections, welds and the base of columns
- Old paint flaking off structures above running production lines
- Uncertainty between spot repair, overcoat and full removal
- Older frames that may carry lead-based paint
What You Receive
- Condition survey by zone with rust rating to ISO 4628-3 or ASTM D610
- Technical quote stating the method by zone, the system coat by coat and access
- Dry film thickness readings per SSPC-PA 2 and ambient condition logs
- Close-out file with data sheets, batch numbers and before and after photos
Timeline
Set in the quote according to surface area, condition by zone, access and shutdown windows. Quote sent within 24 business hours of receiving photos and dimensions.
Standards & Certifications
- ISO 12944: corrosivity categories and paint system selection
- ISO 4628-3 and ASTM D610: rating of rusting on painted steel
- SSPC-SP 2, SP 3, SP 11, SP 6 and SP 10: surface preparation grades
- SSPC-PA 2: dry film thickness measurement
Industries We Serve
- Mining: concentrator buildings, conveyors and transfer towers
- Steel and metallurgy: crane runways, process buildings, stacks
- Energy: steel structures, towers and pipe racks
- Manufacturing and warehousing: building frames, mezzanines, walkways
Service FAQ
How do you decide between spot repair, overcoat and full removal?
From the measured condition of the existing paint. Rust extent is rated to ISO 4628-3 or ASTM D610, then adhesion and film thickness are checked. Isolated rust on sound paint calls for spot repair; wider rust on well-bonded paint calls for an overcoat; general rusting or poor adhesion calls for full removal. Many structures get a mix, zone by zone.
Can you paint a structure above running equipment?
Yes, with nets, tarps and protective decking to catch debris, abrasive and drips, and coordination with production shifts. Some areas can only be done during a shutdown: hot zones, areas above sensitive lines, moving parts. The quote separates what is done in operation from what waits for the shutdown.
How is an overhead crane runway painted?
The crane and its power supply are locked out, stops are placed on the runway and the work is coordinated with operators. Rails and wheel contact surfaces are protected, the girders and brackets are prepared to the specified grade, and the system is applied with a stripe coat on edges, welds and bolting. Thickness is measured to SSPC-PA 2.
What if the old paint on the structure contains lead?
Lead-based paint is common on older frames. It is tested before the quote, and if lead is present, removal or encapsulation follows specific containment, worker protection and waste handling measures, through our lead paint removal service. Repainting then proceeds on the clean steel under the same file.
How much does steel structure painting cost?
Pricing is by quote. It depends on the area and shape of the members, the condition of the existing paint, access, the system, the preparation grade and the work window. Send photos, approximate dimensions and the location: we send a quote within 24 business hours.
Technical guides
Related applications
Concrete industrial use cases where this service is applied.
Other Services
Areas we serve
- Industrial coatings and maintenance in Quebec
- Industrial coatings and maintenance in Montreal
- Industrial coatings and maintenance in Ontario
- Industrial coatings and maintenance in Abitibi-Témiscamingue
- Industrial coatings and maintenance on the Côte-Nord
- Industrial coatings and maintenance in Saguenay–Lac-Saint-Jean
- Industrial coatings and maintenance in Mauricie and Centre-du-Québec
- Industrial coatings and maintenance in Montérégie
Go deeper
Our technical notes on the subject — applicable standards, selection criteria and implementation traps.
Steel tower and lattice structure painting: aged zinc, access and safety
Telecommunication towers and lattice structures, galvanized or already painted, eventually rust once the zinc is consumed. This guide explains how to assess condition, prepare aged zinc, select the system, organize rope or aerial lift access and manage work at height.
7 minPainting new steel: in the shop or in the field?
Painting new structural steel in the shop gives more consistent preparation, but handling, erection and connections require touch-up in the field. This guide compares both approaches, explains how to treat connections, when to apply the topcoat on site and which inspections to plan.
7 minPipe rack painting: access, pipe supports and work around live process
A pipe rack rusts first at the supports, where the pipe rests on the beam and traps water. This guide explains how to treat those contact areas, how to prepare steel while the process keeps running, how to organize access and which ISO 12944 systems to select for the structure and the lines.
7 minPainting over an old industrial coating: how to check adhesion and compatibility
Painting over an existing coating works when it still adheres, is compatible with the new paint and contains no unmanaged lead. This guide describes the tests to run and how to choose between overcoating, spot repair and full removal.
7 minDuplex systems: painting galvanized steel without losing adhesion
A duplex system combines galvanizing and paint to protect steel longer than either one alone. The paint still has to adhere to the zinc. This guide explains zinc preparation (cleaning, SSPC-SP 16 brush-off blasting, ASTM D6386), compatible primers, classic mistakes such as alkyd over zinc, and maintenance.
7 minDe-icing salt corrosion: protecting steel in Quebec
De-icing salts leave chlorides on bridges, parking structures and steel near roads and loading docks. This guide explains how they speed up corrosion, how to classify the environment under ISO 12944, how to measure soluble salts to ISO 8502-6 and -9 and how to wash steel before painting.
7 min